Diversity factor and load factor pdf

The word demand itself says the meaning of demand factor. Industrial loads have low diversity factors usually of 1. Some technical references use the term coincidence factor to mean the product of rated load factor, demand diversity factor, and coincidence factor. The coincident nature of load demands is of great importance to the distribution planning engineer as it is a key factor in the economic sizing of plant. Demand the load is time dependent as well as being dependent upon equipment characteristics. In other words, coincident demand reduction will simply be the product of the. The load factor of a system may be a daily load factor, a monthly load factor, or an annual load factor, depending on the measure of time taken.

The load factor method uses one or more predefined factors to convert specific data values to demand values usable by the system model. Diversity factors have been developed for main feeders supplying a number of feeders, and typically, they are 1. Distinguish between load curve and load duration curve. Would you for you were accessing requires variables to wire but it is in home. When it comes to the workplace, this can often mean consideration of employee and job seeker heritage, background and demographics. The average load is the average of different loads during a period.

It is the ratio of actual energy produced to the maximum. Diversity factor is defined as the ratio of the sum of the maximum demands of the various part of a system to the coincident maximum demand of the. The greater the diversity factor, the lesser is the cost of generation of power. Customer care understanding load factor austin energy. If the load factor is higher on a power station, the cost per unit generated will be lesser. Diversity can be handled at the air system level using the diversity factor input. Demand, load, diversity, plant capacity and plant use. Chapter three load curves the curve showing the variation of. The diversified load is the combination of each devices full load capacity, utilization factor, diversity factor, demand factor and the load factor. The lesser the maximum demand the higher is the load factor. Diversity factor as per iec 60439 circuits function diversity. Following formula is used to calculate diversity factor. Comparison of effect of office level and individual.

The unified facilities criteria ufc system is prescribed by milstd 3007 and provides. The load factor may be daily load factor, monthly load factor or annual load factor if the time period considered is a day or month or year. The average of loads occurring on the power station in a given period day or. Two factor authentication adds a second layer of security to your online accounts. Loss factor average power losspower loss at peak load. After finding out the diversity factor, the correct capacity of a dg set can be found out. Key role verifying the diversity factor can construct comparatively lower capacity substation is defined as shown as in long cable size. The individual equipment diversity factor provided in the handbook is used to calculate the load factors. The diversity factor normally has a value greater than unity and is only equal to unity if all the individual demands occur simultaneously. Mohammed tawfeeq 2 table 71 current requirements for different power points and equipmen. The buildings analyzed for this report consisted of.

Compute the diversity factor, load factor, and loss factor. Except of homes and buildings, diversity factor in electrical wiring installation may be neglected in offices or those places where all connected loads operate at once. Methods to improve load factor and diversity factortopics discussed. Diversity factor sum of individual maximum demandsmaximum system demand. Add all individual appliance diversified gas loads together. Impact of load diversity on the design of isolated grid. Diversity factor is mostly used for distribution feeder size and transformer as well as to determine the maximum peak load and diversity factor is. Agriculture loads this type of load is mainly motor pumpssets load for irrigation purposes. Diversity factor and load factor are closely related. Demand factor maximum demand of a system total connected load on the. Diversity factor divty factor 0 100% that fraction of the total load that this particular item contributed to the peak demand.

For transformer no 1, sum of the maximum demand connected load. Diversity factor as per iec 60439 circuits function. The most popular coefficient factors used by engineers to estimate the load on the distribution power system are the diversity factor df and kwhtopeakkw or conversion factor ql. Equation 1 suggested by sarfraz and bach 2017b is used to calculate the diversity factor df. Equipment load factors, use factors and diversity factors. Purpose overview gas meter selection table natural gas. In other terms, diversity factor 0 to 100% is a fraction of total load that is particular item contributed to peak demand. Diversity factor maximum system demand sum of individual maximum demands 1. The diversity factor is defined to be the sum of individual noncoincident customer peak demands divided by the coincident peak demand of customer as a group. The residential load has the highest diversity factor. In a building, the whole load of electrical wiring installation doesnt use at the same time. If load factor is low 0 or 25% you are paying maximum amount of kwh consumption. If the energy balance we do for this facility comes out within reason, but the demand balance shows far too many kw for the peak load, then we can use the diversity factor to bring the kw into line with the facilitys true. Load factor is generally calculated for a day, month or year.

In the literature on diversity factors and load shapes, we covered papers reporting the existence of databases of monitored enduses. Electrical load estimation philadelphia university. The diversity factor is the reciprocal of the coincidence factor or equation. Diversity factor is ratio of the sum of the individual maximum demands of the various sub circuit of. Since power losses are proportional to the square of the load. Demand can be used to characterize real power, reactive power, total power, orcurrent. The load factor important in electricity because of a peculiar technical situation, 521. The resistive load obstructs the flow of electrical. The aggregate load \displaystyle \left is time dependent as well as being dependent upon equipment characteristics. Multiply the maximum mjhr rating for each appliance by its applicable diversity factor. Equipment load factors, use factors and diversity factors as.

Annual load factor total annual energy annual peak load 8760 10. Apr 17, 2020 the load factor is represented in percentage, i. Impact of load diversity on the design of isolated grid solar. May 04, 2016 if load factor is 1 or 100% this is best situation for system and consumer both. The load factor is called daily load factor if the period of time is a day, and if the period of time is a month, the load factor is called monthly load factor, and similarly for the year load factor. Demand factors will be applied to connected loads when calculating the required ampere capacity ampacity of conductors, capacity of transformers, and all equipment associated with distribution of electrical power to utilization equipment. Under this definition other issues such as diversity and load factor are automatically accounted for, and only the coincidence factor will be necessary to determine coincident demand reductions from readily observable equipment nameplate rated. Load factor, demand factor, diversity factor, maximum. The diversity factor recognizes that the whole load does not equal the sum of its parts due. Electrical engineering department sanjay ghodawat polytechnic. Adequate metering practicable for large consumers, 531. The different types of load are explained below in details. Request pdf demand factordiversity factor utilization factorload factor 1 demand factor in iec, max. In electrical design, this condition is known as diversity.

In general, the types of load can be divided into the following categories. This is the correct value to use because it is the maximum load imposed on the chiller. Five terms are essential to the analysis of load characteristics. The diversity factor is used to change lighting and. Northeast energy efficiency partnerships neep defines it as, the ratio of the average hourly demand during a specified.

This page compares load factor vs demand factor vs diversity factor and mentions formulas or equations of them. The diversified load is the total expected power, or load, to be drawn during a peak period by a device or system of devices. The average of loads occurring on the power station in a given period day or month or year is known as average load or average demand. In other words, we do not use all the loads at once at home i.

Typical diversity factors are given in table 7 1and table 72 from jordanian code. Load factor, demand factor, diversity factor, maximum demand in bangla. The nature of the load depends on the load factor, demand factor, diversity factor, power factor, and a utilization factor of the system. Explain in detail, the classification of loads and list out the important characteristics of various types of loads. Load factor is always less than 1 because average load is smaller than the maximum demand. The diversity factor is greater than or equal to one and is.

The load factor percentage is derived by dividing the total kilowatthours kwh consumed in a designated period by the product of the maximum demand in. Demand factor maximum demand total connected load demand factor factor should be. Load factor it is the ratio of the average load to the maximum load for a certain period of time. Comparison of effect of office level and individual equipment. Load factor over a designated time period average load peak load diversity factor sum of individual maximum demandsmaximum system demand loss factor average power losspower loss at peak load under steady load, loss factor load factor short lasting peak. The composite load is a function of frequency and voltage and its form a major part of the system load. Demand, load, diversity, plant capacity and plant use factor. But my consultant telling that we can go for a diversity factor of 80% so the chiller load has reduced to 1160 tr.

It is the ratio of the sum of the individual maximum demands of the various subdivisions of a system to the maximum demand of the whole system load diversity. Peak demand over some period of time is the most common way utilities quantify a circuits load. The load loads of 250 kva, 200 kva, 150 kva and 400 kva and on a service or feeder is the sum of all of the branch demand factors of 90%, 80%, 75% and 85% respec loads subject to their demand factors as permitted by tively. Methods to improve load factor and diversity factor youtube. Therefore load factor, maximum demand, diversity, losses and growth characteristics are particularly discussed. Under this definition other issues such as diversity and load factor are automatically accounted for, and only the coincidence factor will be necessary to determine coincident demand reductions from readily observable equipment nameplate rated information. Energy factor by exxonmobil is a hub for cuttingedge energy and technology news, insights and innovative energy solutions. The load factor important in elec tricity because of a peculiar technical situation, 521. Note that a 600 kva transformer can be used instead of these terms are demand factor and diversity factor. The ratio of sum of individual maximum demand of all the consumers supplied by it to maximum demand of power station is called diversity factor. Diversity factor in electrical wiring installation.

Difference between load factor and diversity factor best. Therefore that is, the load factor is equal to the loss factor and they are equal to the tt constant. Key role verifying the diversity factor can construct comparatively lower capacity substation is. The ratio of actual maximum demand on the system to the total rated load connected with the system is called demand factor. Diversity factor sum of individual maximum demands maximum demand of the system.

System load variation load characteristics load curves and load duration curve daily, weekly and annual load factor diversity factor. Installers must apply gas load diversity to all gas meter selections. From figure 2 9 loss factor lsf is the ratio of the average power loss to the peak load loss, during a specified period of time. An introduction to electrical power requirements for. The load factor is the ratio of the average load over a designated period of time, usually 1 year, to the maximum load occurring in that period or equation. Diversity factor may be neglected in case of final sub circuits.

The load factor is always less than 1 because the average load is less than the maximum demand. Equipment load factors, use factors and diversity factors as well as a general. The ratio of the sum of the individual peak demands in a system to the peak demand of the whole system. Demanddiversity factor value quick reference electrical. Load assessment was carried out using load assessment form to determine the kind of load and estimate the daily energy demand of the community. Difference between load factor vs demand factor vs diversity factor. Demand factordiversity factorutilization factorload factor. Request pdf demand factor diversity factor utilization factor load factor 1 demand factor in iec, max. The load factor is called daily load factor if the period of time is a day, and if the period of time is a month, the load factor is called monthly load factor, and. If one has a low load factor it means that the customer has a very high peak load for a very short period.

Diversity factor in load iestimationi or calculation. Factor in power system math for eee job preparation fast. Responsibility factor demand the load average over a specified time period, often 15, 20, or 30 minutes. For example, a factor is used to convert annual cu mulative usage to a monthly value, or a factor is used to conve rt.

Jun 19, 2019 hai, i am designing for the 25 floor residential building. It is ratio of average load to maximum demand during certain period of time e. I am getting total load for the building as 1450 tr. If the diversity factor among the transformers is 1. Verifying your identity using a second factor like your phone or other mobile device prevents anyone but you from logging in, even if they know your password. If we calculate the load factor for a day then average load as well as maximum demand for the day shall be considered. Peak kw kw if the load is on peak, then this value equal to the total kw x diversity factor finally, the load inventory data can be represented graphically to show the distribution of demand and energy consumption. Diversity factor and demand factors considered are based on design considerations of electricity company of ghana in typical rural electrification projects of the country. For example, one might have ten air conditioning units that are 20 tons each at a facility with an average full load. The diversity factor recognizes that the whole load does not equal the sum of its parts due to this time interdependence or diversity. The goal of this project is to compile a library of schedules and diversity factors for energy and cooling load calculations in various types of. Diversity factor is the ratio of maximum electrical load recorded at equipment panels to the sum of peak electrical load of each individual piece of equipment. Demand factor diversity factor utilization factor load factor 1 demand factor demand factor maximum demand of a system total connected load on the system demand factor is always less than one. In this report the results of the application of the diversity factor calculations are applied to the data collected for this project.

Apr 24, 2018 load factor average load maximum demand. Load factor vs demand factor vs diversity factor formula. The diversity factor gives us a correction factor to use, which results in a lower total kw load for the ten ac units. To better understand how these terms are applied when calculating loads, you must understand their meaning. Average demand, maximum demand, demand factor, plant capacity factor, plant use factor, diversity factor, load factor and plant load factor simple numerical based on above 1. Similarly, load factor for a month or year is calculated considering average load and maximum demand for month or year. The load factor provides an indication of how well any customer is utilising any utility asset.

Diversity factor is the reciprocal of the coincident factor. What is diversity factor in electrical wiring installation. Diversity factor total connected load actual maximum load. It is for the designer to make a careful judgment as to the exact level of diversity to be applied. Following formula is used to calculate demand factor. Coincidence factor study residential and commercial.

Load factor may be increased by switching or use of your electrical application. Diversity factor as per iec 60439 circuits function diversity factor in % ks lighting 90% heating and air conditioning 80% socketoutlets lifts and catering hoist for the most powerful motor 100% for the second most powerful motor 75% for all motors 80% 25 diversity factor for apartment block apartment diversity factor in % ks 2 to 4 1 5to. The load factor plays key role in determining the overall cost per unit generated. The load factor is always smaller than 1 due to the fact that the average load is much less than the maximum demand. An introduction to electrical power requirements for buildings. Demand factordiversity factorutilization factorload.